This is the space on the second floor of the north side of new Noyes Lab that is being cleaned out for the majors organic lab. Before the construction of New RAL this space was used for organic staff offices (e.g. Snyder, Fuson) and the distillation lab. 12/3/2005 |
|
This is the east side of the same space that will become the majors organic lab. Before the construction of New RAL this was the organic storeroom. 12/10/2005 |
|
One of the lab benches in the non-majors lab in 467 Noyes has been removed to make room for duct work. | |
This is the space on the north side of the second floor of Noyes Lab looking west that will become the new chem majors lab. 12/24/2005 |
|
Ducts for the new labs. 4/15/2006 |
|
Ducts are very large. 4/15/2006 |
|
Ducts in the ceiling of the majors lab. 4/22/2006 | |
Entrance to the majors lab. There is a hallway behind the wall. 5/6/2006 | |
Majors lab looking north. 5/20/2006 |
|
A new water line had to be installed for the fire protection system. 5/20/2006 |
|
The water line comes into the basement of Noyes Lab on the east side. 5/20/2006 |
|
North end of majors lab. 6/17/2006 |
|
South end of majors lab 6/17/2006 |
|
North end majors lab. 7/1/2006 |
|
Duct in second floor hall. 7/11/2006 |
|
Ducts in ceiling of majors lab | |
Base cabinets for majors lab | |
Majors lab hoods 1/07/2007 |
|
Majors lab hoods 1/07/2007 |
|
Hoods and ducts majors lab looking west. 1/17/2007 |
|
Nonmajors lab | |
Nonmajors lab | |
Nonmajors lab | |
Nonmajors benches 1/07/2007 |
|
Service space between benches. 1/29/2006 |
|
Non-majors bench top. 1/29/2006 |
|
Storeroom 2/26/2007 | |
Hall outside of labs 1/31/2007 | |
Workstations nonmajors lab. 3/14/2007 | |
Workstations 3/15/2007 | |
Majors lab 3/30/2007 | |
Majors Lab 3/30/30 | |
Non-majors 4/30/2007 | |
Non-majors 4/30/2007 | |