Door to old library | |
The first step is removal of asbestos tile on the floor |
. |
The interior walls are ready to be removed 11/03/2005 |
|
Construction area on north side of Noyes Lab. 11/10/2005 |
|
Interior walls are being removed for the new library. 11/10/2005 |
|
11/19/2005 |
|
11/19/2005 |
|
Outside wall between old and new parts of Noyes Lab. New doors will be cut through the brick wall. 11/19/2005 |
|
Physical chemistry research lab on the north east corner of the first floor of Noyes Lab. 11/26/2005 |
|
This is the old physical chemistry teaching lab. 11/26/2005 |
|
This will be the west end of the new library. The far door opens into the main hall of Noyes Lab. 11/26/2005 |
|
New doors had to be cut through the old outside wall of the first section of Noyes Lab. 12/3/2005 |
|
The wall is very thick. 12/3/2005 |
|
The bricks are taken down the elevator in wheel barrels.
|
|
This will be the east end of the new library. The space used to be p-chem offices, conference room, and research labs. 12/3/2005 |
|
Construction area on the north side of Noyes Lab. 12/10/2005 |
|
This space will become the circulation desk and offices. In earlier years it was part of the research lab for Flygare and Gutowsky. 12/17/2005 |
|
New door into the library from the west hall of Noyes Lab. 1/14/2006 |
|
Library plans in the work area. 12/24/2005 |
|
New Library renovation looking west. 1/06. |
|
New Library renovation, looking east. 1/06 |
|
Studs for new library walls. 3/11/2006 | |
Duct in the ceiling of the library. 3/11/2006 | |
Dry wall ready to be installed in the library. 3/11/2006 | |
Dry wall on outside wall of library. 3/23/2006 | |
Ducts for the library. 3/23/2006 | |
Interior dry wall for the library. 4/1/2006 |
|
South east section of the library on April 15, 2006. | |
Construction of the new circulation desk. 4/22/2006 | |
Dry wall on circulation desk. 5/6/2006 | |
Breaker box by the north door. 6/2/2006 | |
The original stone window sills have been removed. 6/2/2006 |
|
This will be the main entrance to the library . 6/2/2006 |
|
The halls get a bit crowded. 6/9/2006 |
|
Walls for new office. 6/10/2006 |
|
Door frames for conference room. 6/10/2006 |
|
New floor covered to protect it.. 6/17/2006 |
|
Hole has been cut in the hall wall for the new door into the library. 6/17/2006 |
|
First floor wall. 6/21/2006 |
|
Hallway outside of the new library. 6/21/2006 |
|
MEMO TO: Biochemistry, Chemical and Biomolecular Engineering and Chemistry Faculty FROM: Tina Chrzastowski, Chemistry Librarian DATE: June 19, 2006 Our present plan calls for the Chemistry Library to relocate to 170 Noyes
Lab between June 28 and July 19, 2006. |
|
Frame for the main door. 6/28/2006 |
|
North room about finished. 6/28/2006 |
|
Cabinets and shelves being installed. 6/28/2006 |
|
New shelves in north section of the library. 6/29/2006 |
|
Shelves in south section. 7/1/2006 |
|
Circulation desk. 7/1/2006 |
|
South room. 7/1/2006 |
|
Main stacks. 7/6/2006 | |
Stacks. 7/7/2006 | |
Work stations on south wall. 7/7/2006 |
|
Wall behind circulation desk. 7/7/2006 |
|
Circulation desk. 7/7/2006 | |
Wall outside office. 7/7/2006 |
|
Circulation area. 7/10/2006 |
|
Working on main entrance. 7/12/2006 |
|
Main entrance. 7/15/2006 |
|
Future book return 7/15/2006 |
|
Main door frame. 7/17/2006 |
|
Books are being moved to the new library. 7/19/2006 |
|
7/18/2006 | |
Removing books from the old library. 7/19/2006 |
|
Empty shelves in the old library.
7/19/2006 |
|
The books are gone...
7/19/2006 |
|
The old library...
7/19/2006 |
|
Journals have been moved to the new library. 7/21/2006 |
|
Empty shelves 7/21/2006 |
|
New desks are being installed. 7/21/2006 |
|
Tina's office is almost done. 7/21/2006 |
|
Empty library... 7/24/2004 |
|
Library moved.
|
|