Door to old library

The first step is removal of asbestos tile on the floor

.

The interior walls are ready to be removed 11/03/2005

Construction area on north side of Noyes Lab.

11/10/2005

Interior walls are being removed for the new library.

11/10/2005

11/19/2005

11/19/2005

Outside wall between old and new parts of Noyes Lab. New doors will be cut through the brick wall.

11/19/2005

 

Physical chemistry research lab on the north east corner of the first floor of Noyes Lab.

11/26/2005

This is the old physical chemistry teaching lab.

11/26/2005

This will be the west end of the new library. The far door opens into the main hall of Noyes Lab.

11/26/2005

New doors had to be cut through the old outside wall of the first section of Noyes Lab.

12/3/2005

The wall is very thick.

12/3/2005

The bricks are taken down the elevator in wheel barrels.

 

This will be the east end of the new library. The space used to be p-chem offices, conference room, and research labs.

12/3/2005

Construction area on the north side of Noyes Lab.

12/10/2005

This space will become the circulation desk and offices.

In earlier years it was part of the research lab for Flygare and Gutowsky.

12/17/2005

New door into the library from the west hall of Noyes Lab.

1/14/2006

Library plans in the work area.

12/24/2005

New Library renovation looking west. 1/06.

New Library renovation, looking east. 1/06

Studs for new library walls. 3/11/2006
Duct in the ceiling of the library. 3/11/2006
Dry wall ready to be installed in the library. 3/11/2006
Dry wall on outside wall of library. 3/23/2006
Ducts for the library. 3/23/2006

Interior dry wall for the library.

4/1/2006

South east section of the library on April 15, 2006.
Construction of the new circulation desk. 4/22/2006
Dry wall on circulation desk. 5/6/2006
Breaker box by the north door. 6/2/2006

The original stone window sills have been removed.

6/2/2006

This will be the main entrance to the library .

6/2/2006

The halls get a bit crowded.

6/9/2006

Walls for new office.

6/10/2006

Door frames for conference room.

6/10/2006

New floor covered to protect it..

6/17/2006

Hole has been cut in the hall wall for the new door into the library.

6/17/2006

First floor wall.

6/21/2006

Hallway outside of the new library.

6/21/2006

 

MEMO

TO:   Biochemistry, Chemical and Biomolecular Engineering and Chemistry Faculty

FROM:  Tina Chrzastowski, Chemistry Librarian

DATE:  June 19, 2006

Our present plan calls for the Chemistry Library to relocate to 170 Noyes Lab between June 28 and July 19, 2006.

Frame for the main door.

6/28/2006

North room about finished.

6/28/2006

Cabinets and shelves being installed.

6/28/2006

New shelves in north section of the library.

6/29/2006

Shelves in south section.

7/1/2006

Circulation desk.

7/1/2006

South room.

7/1/2006

Main stacks. 7/6/2006
Stacks. 7/7/2006

Work stations on south wall.

7/7/2006

Wall behind circulation desk.

7/7/2006

Circulation desk. 7/7/2006

Wall outside office.

7/7/2006

Circulation area.

7/10/2006

Working on main entrance.

7/12/2006

Main entrance.

7/15/2006

Future book return

7/15/2006

Main door frame.

7/17/2006

Books are being moved to the new library.

7/19/2006

7/18/2006

Removing books from the old library.

7/19/2006

Empty shelves in the old library.

 

7/19/2006

The books are gone...

 

7/19/2006

The old library...

 

7/19/2006

Journals have been moved to the new library.

7/21/2006

Empty shelves

7/21/2006

New desks are being installed.

7/21/2006

Tina's office is almost done.

7/21/2006

Empty library...

7/24/2004

Library moved.